16 questions answered
Consent, compliance & building code: frequently asked questions
Plain-language answers about consents, inspections and compliance. Requirements depend on the actual property and scope, so always confirm them for your project.
Consent, compliance & building code
16 questions01Do renovations always need building consent in Auckland?
No, but structural, plumbing, drainage or weathertightness work may require consent or specialist input. Requirements are checked against the actual scope, not assumed from a similar project.
02Who checks whether my project needs consent?
We identify where consent, design or specialist input is likely to be needed as part of scoping your project, and can point you to the right professional or Auckland Council guidance.
03What's the difference between building consent and resource consent?
Building consent relates to compliance with the Building Code, while resource consent relates to district plan rules such as height, boundary or zoning. Some projects need one, both or neither.
04How long does it take to get building consent in Auckland?
Auckland Council's statutory timeframe is 20 working days for a complete application, though it can take longer if further information is requested. We build realistic consent timeframes into your programme.
05Can you help me apply for building consent?
We can coordinate the consent process as part of an agreed project scope, working with the relevant designer or professional where specialist documentation is required.
06What happens if previous work on my home wasn't consented?
Unconsented work can affect insurance, sale and future renovation plans. If it's found during a project, we discuss the implications and options with you before proceeding.
07Are your trades licensed and qualified?
Restricted building work and licensed trades such as plumbing and electrical are carried out or overseen by appropriately qualified people, as required for the specific work involved.
08What is restricted building work, and does my project involve it?
Restricted building work covers building elements critical to a home's structure and weathertightness, and must be carried out or supervised by a Licensed Building Practitioner. Whether it applies depends on your scope.
09Do you organise council inspections during the build?
Where a project requires building consent, the required inspections are coordinated as part of the build programme.
10What is a Code Compliance Certificate, and when do I get one?
A Code Compliance Certificate confirms consented work meets the Building Code. It's issued by the council once final inspections are passed, and forms part of your project's completion documentation.
11Does removing a wall always require consent?
Not always, but if the wall is structural or supports part of the building, consent and engineering input are typically required. This is checked before any wall removal is scoped.
12What building code clauses commonly affect renovation projects?
Common clauses relate to structure, weathertightness, moisture, drainage and means of escape from fire, depending on the scope. Relevant clauses are identified once your project is defined.
13Can I do some of the work myself to save money?
Some non-restricted work may be suitable for owner involvement, but this needs to be agreed upfront, since mixing contractor and owner work can affect programme, warranty and compliance.
14What happens if my property has a heritage or special-character overlay?
Heritage or special-character rules can affect what changes are permitted, particularly to exteriors. These are property-specific and should be checked with Auckland Council before design decisions are made.
15Do you handle earthquake-prone or weathertightness assessments?
We can identify where a specialist assessment is needed and coordinate with the relevant professional, though these assessments are typically carried out by qualified engineers or building surveyors.
16What quality checks happen before handover?
The agreed scope is reviewed against what was actually delivered, outstanding items are recorded, and handover is documented so you have a clear record of the completed work.
Go deeper: Building consent and compliance guide →