Small treated-pine deck
From $6,500
Up to around 20 m² on a flat site
Auckland renovation services
New timber and composite decks, deck extensions and re-decking for Auckland homes, built on a checked frame with the consent and barrier position confirmed first.
Quick answer
Our Auckland deck builders build new timber and composite decks, deck extensions and re-decking, starting with a check of the ground, the frame and the height above ground so the consent and barrier position is known before the deck is priced. Published prices: small treated-pine deck from $6,500; treated pine $300 – $450/m²; kwila / hardwood $450 – $650/m²; composite $500 – $750/m². A standard 20–30 m² deck has a typical build window of 1–2 weeks. Our recent deck projects in Pakuranga each took 2–3 days on site. Send photos, rough dimensions and the height of the deck above the ground so we can advise on consent, barriers and the next step.
Last reviewed by the My Homes Renovation Expert team.
Service overview
A deck lasts only as long as the structure under it. Every deck project starts with the ground, the piles or footings, the bearers and joists, and the way the deck connects to the house. The board, fixings, barrier and finish are agreed before anything is ordered.
Projects range from a ground-level deck off the living room to raised decks with steps and balustrades, deck extensions, re-decking on a sound existing frame, and decks with a pergola or cover. Where the height or the ground around the deck means it needs a building consent or a safety barrier, that is identified at the start so it is priced and programmed correctly.
Typical cost
Decks in Auckland are priced per square metre by decking material. These are the same prices published by My Homes Construct Ltd, the company behind Renovation Expert.
From $6,500
Up to around 20 m² on a flat site
$300 – $450/m²
Budget-friendly classic, supply and build
$450 – $650/m²
Premium timber look, supply and build
$500 – $750/m²
Low-maintenance boards, supply and build
NZD including GST. Supply and build. Final cost varies with deck height, balustrades, stairs, design complexity and site conditions; elevated and multi-level decks are itemised in your quote. Request a site visit for a written quote for your property.
Typical timeline
A standard 20–30 m² deck typically takes 1–2 weeks from start to finish, depending on materials and site complexity, as published by My Homes Construct Ltd.
Smaller jobs take less time. Our recent deck projects in Pakuranga, including new decks, re-decking on a sound frame and a deck extension, each took 2–3 days on site. Design, any building consent and material delivery come before work starts, and elevated or multi-level decks take longer.
Scope and budget
A site visit and written scope are needed before a planning allowance can become a reliable project quotation.
Real completed work




Before and after

This deck extension in Pakuranga, East Auckland, took 2–3 days on site. The before photo shows the new joist frame set out along the side of the house, joining the existing deck at the far end. The after photo shows the finished pine decking and timber balustrade along the same side of the house.
Extending a deck changes its size and can change its height above the ground, so the frame connection, levels, barrier and consent position were checked for the whole deck, not only the new section.
More of our work in Pakuranga →How the work is organised
Measure the area and check the ground, heights, any existing frame, drainage and access from the house.
Confirm the layout, boards, fixings, steps and barrier, and whether the deck is exempt or needs consent.
Set out footings, bearers and joists, then lay the boards and build the steps and barriers.
Check levels, fixings and barriers, apply any agreed oil or stain, and explain the maintenance.
Questions homeowners ask
A new deck in Auckland costs $300 – $450/m² for treated pine, $450 – $650/m² for kwila or hardwood and $500 – $750/m² for composite, including GST, supply and build. A small treated-pine deck of up to around 20 m² on a flat site starts from $6,500. Height, balustrades, stairs, design complexity and site conditions are itemised in a written quote after a site measure.
A standard 20–30 m² deck typically takes 1–2 weeks from start to finish, depending on materials and site complexity. Smaller jobs are quicker: our recent deck projects in Pakuranga, including new decks, re-decking and a deck extension, each took 2–3 days on site. Design, any building consent and material delivery come before work starts.
A deck is exempt from building consent under Schedule 1 of the Building Act 2004 when nobody could fall more than 1.5 metres from it, even if it collapsed. The fall is judged from the ground around the deck, so a low deck beside a slope or retaining wall can still need consent. Exempt decks must still comply with the Building Code.
Building Code clause F4 requires a barrier where people could fall 1 metre or more. That is a separate test from consent, so a deck can be exempt from consent and still need a compliant barrier.
Treated pine is the most cost-effective choice and suits ground-level and standard decks. Kwila and other hardwoods cost more and give a dense, premium timber finish. Composite costs the most per square metre and does not need oiling, but it still needs a sound, ventilated frame and the manufacturer's fixing and spacing details. Budget, sun exposure, maintenance and how the deck is used decide the better choice.
Sometimes. An existing frame is reused only after the joists, bearers, piles, fixings and the connection to the house are checked for decay and movement. New boards cannot fix a failing substructure, so damaged framing is repaired or replaced first.
Yes. The new section is tied into the existing deck after its frame, levels and fixings are checked, and it is set out to match the existing height and board direction. A larger or higher deck can change the possible fall, so the consent and barrier position is checked again for the extended deck.
Where we work
Our team is based in West Harbour and works across the Auckland region. See what to check for homes in your part of the city:
Plan with more context
Deck renovation in Auckland starts below the boards, with framing, fixings and drainage. See what to inspect and decide before resurfacing or extending.
Read guide ->An outdoor room renovation should suit Auckland's sun, wind and rain before furniture is chosen. Learn how to plan shelter, drainage and indoor flow.
Read guide ->Not sure whether to repair or replace timber? Learn how to check the extent of rot, find the moisture source and choose a repair that will actually last.
Read guide ->Building consent-exempt work still has to meet the Building Code. Learn how exemptions work, what to record, and when to get professional advice first.
Read guide ->Looking for carpenter services in Auckland? Learn how to describe the job, compare quotes fairly and check a carpenter's experience before work begins.
Read guide ->Find out when a renovation needs an LBP, what restricted building work covers, and how to check a licence and keep the right records for your home.
Read guide ->Your home, made more useful
Share your ideas and property details. We’ll help you identify the clearest next step.