What to focus on
Renovation priorities for Epsom homes
Epsom homes from the inter-war and wartime era often have solid bones but a compartmentalised layout, with a separate kitchen, formal rooms and a single bathroom. Typical renovations reorganise the plan around family life: combining kitchen and living areas, adding an ensuite or second bathroom, and creating a direct link to a sunny lawn. Because sections are usually larger, there is often room to extend at ground level rather than going up.
Before planning a layout change, it is worth testing what is hidden in the house. Asbestos is a realistic possibility in a house of this age, as it was used in some old linings, vinyl and textured ceilings, so sampling suspect materials before demolition is sensible. Check the age of the switchboard, wiring and pipework, and the condition of the roof and piles. These findings often decide whether a staged renovation or a single larger project makes more sense.
Common questions
Renovating in Epsom: questions answered
Is there room to extend at ground level on an Epsom section?
Often there is, because sections in parts of Epsom are generous. The practical limits usually come from the site rather than its size: coverage and impervious area rules, easements or shared driveways, protected trees, and how new roof water will be managed. Mapping these on a site plan first shows where a single-level extension can realistically sit.
Can I remove a large tree to make room for an extension in Epsom?
Check before you cut. Some trees are protected under the Auckland Unitary Plan, either as scheduled notable trees or through overlay rules, and removing them or working within their root zone can then need resource consent. An arborist can tell you whether a tree is protected and whether the extension can be designed around it, for example with piled foundations that limit root damage.