Quick answer
What homeowners need to know
A complete kitchen renovation coordinates brief, layout, appliances, joinery, services, finishes, manufacture, installation and commissioning in that order.
Use a responsibility schedule so appliance supply, connection, templating and warranty tasks have named owners.
Key takeaways
- Strip-out is the stage where hidden conditions appear, so be ready to make decisions straight after demolition.
- Rough-in happens before linings and joinery, and it is the cheapest point to get service positions right.
- Benchtops are usually templated after the base cabinets are installed and fixed level.
- Workflow, appliance clearances and service locations should be resolved before cabinetry is ordered.
Kitchen renovation
The stages of a complete kitchen renovation
Strip-out is the stage where hidden conditions appear, so be ready to make decisions straight after demolition. Once old cabinets and linings are removed, rot under the sink, outdated wiring or uneven floors may become visible. In homes built before 2000, have materials such as vinyl flooring, textured ceilings and older wall sheets tested for asbestos before anyone cuts, sands or removes them.
Rough-in happens before linings and joinery, and it is the cheapest point to get service positions right. The plumber and electrician set pipes, wastes, cables and boxes to the final plan, including power for the rangehood, under-cabinet lights and integrated appliances. Walk the room with the plan at this stage and confirm every outlet height and position before the walls are closed.
Benchtops are usually templated after the base cabinets are installed and fixed level. That means the cabinet installer, benchtop fabricator and plumber depend on each other in sequence. Ask your contractor to show you that order on the programme, and confirm that the sink, tap and cooktop will be on site for templating so cut-outs are measured from the real items.
Scope before solutions
Decisions to make before committing
Settle these points before an idea becomes an order, contract or construction instruction.
Use a responsibility schedule so appliance supply, connection, templating and warranty tasks have named owners.
custom joinery and hardware specification
benchtop, splashback and appliance choices
relocated walls, plumbing, electrical work or ventilation
Practical sequence
A step-by-step planning process
- 01
Define the exact outcome you need and how success will be checked.
- 02
Map storage, preparation, cooking, cleaning and waste movements for the household.
- 03
Confirm appliance models and service requirements before finalising cabinet dimensions.
- 04
Coordinate lighting, power, plumbing, ventilation, surfaces and installation tolerances.
- 05
Approve a complete set of plans, finishes and responsibilities before manufacture.

Cost and time
How to build a more reliable budget and programme
A fixed price or completion date needs a measured scope and a site visit. Ask qualified trades and Auckland Council for project-specific guidance where layout changes affect plumbing, electrical, structure or ventilation.
Use the calculator, then request a site-specific assessment.
Risk control
Common mistakes to avoid
- Gaps between separate suppliers often appear at benchtop, appliance and service interfaces.
- designing around assumed appliance sizes
- ordering finishes before layout and service positions are frozen
Accuracy and compliance
Use current official information
Primary sources used for this guide
- Building and renovation projectsAuckland Council
- Check if you need consentsBuilding Performance (MBIE)
- Home renovation and repairConsumer Protection New Zealand
Common questions
Frequently asked questions
What order should a kitchen renovation be done in?
A typical order is design and selections, ordering, strip-out, rough-in plumbing and electrical, wall and ceiling repairs, flooring where it runs under cabinets, cabinet installation, benchtop templating and fitting, splashback, then final connections and commissioning. The exact sequence depends on your floor finish and appliance choices, so confirm it with your contractor.
Should flooring go in before or after kitchen cabinets?
It depends on the flooring type and your future plans. Some floating floors must be laid around cabinets rather than under them so they can expand and contract. Tiles and some timber floors can run under cabinets, which makes later layout changes easier. Follow the flooring manufacturer's instructions and agree the sequence before ordering.
What should I check before signing off a finished kitchen?
Check that every door and drawer opens and closes smoothly, appliances work, taps and wastes do not leak, and lights and power outlets operate. Look for chips, gaps and tidy sealant along the benchtop and splashback. Collect appliance manuals, product warranty details, care instructions and the electrical certificate of compliance before making the final payment.